詳細(xì)介紹
騰達(dá)試驗(yàn)儀器廠:
抗靜態(tài)荷載試驗(yàn)儀是**檢測(cè)儀器,適用于瀝青和高分子防水卷材及其它防水卷材經(jīng)靜態(tài)荷載穿刺或沖擊后其穿透性能的檢測(cè)。依據(jù)GB/T 328.25-2007《建筑防水卷材試驗(yàn)方法第25部分:瀝青和高分子防水卷材抗靜態(tài)荷載》設(shè)計(jì)制造的。
The static load tester is a testing instrument that is suitable for testing the penetration performance of asphalt and polymer waterproofing membranes and other waterproofing membranes after puncture or impact under static load.Designed and manufactured in accordance with GB/T 328.25-2007"Test methods for building waterproofing membranes-Part 25:Asphalt and polymer waterproofing membranes-resistance to static loads".
抗靜態(tài)荷載試驗(yàn)儀技術(shù)參數(shù)
★不銹鋼球狀穿刺工具:(Φ10±0.05)mm;硬度:HRC:50
★荷載桿重量:2kg1個(gè)
★荷載盤重量:3kg1個(gè);5kg3個(gè)
★球狀穿刺工具的工作行程:40mm±2mm
★外形尺寸:460X350X680mm
Technical parameters of static load tester
★Stainless steel ball puncture tool:(Φ10±0.05)mm;hardness:HRC:50
★L(fēng)oad bar weight:2kg1
★L(fēng)oad plate weight:3kg1;5kg3
★Working stroke of spherical puncture tool:40mm±2mm
★Dimensions:460X350X680mm
抗靜態(tài)荷載試驗(yàn)儀工作原理:
在規(guī)定的試驗(yàn)時(shí)間內(nèi),通過(guò)穿刺工具,集中荷載在卷材上面,卷材平放在規(guī)定軟支撐上,試件制備尺寸:550*550±2mm。在卷材整個(gè)寬度除邊緣100mm處取樣,每個(gè)荷載條件取3個(gè)樣。
Working principle of anti-static load tester:
Within the specified test time,the puncture tool is used to focus the load on the coil,and the coil is placed on the soft support.Samples were taken at the entire width of the coil except the edge 100mm,and 3 samples were taken under each load condition.
抗靜態(tài)荷載試驗(yàn)儀試驗(yàn)方法:
將試件用釘子固定在框架上,直接放在發(fā)泡聚苯乙烯上,上表面朝上,用上框架壓緊試件,穿刺工具放在試件中間,試驗(yàn)從5KG開始的每個(gè)載荷間隔用3個(gè)試件,載荷每次增加5KG,直至穿刺發(fā)生,或者直接到A大載荷20KG,每個(gè)載荷間隔24H,加荷載小心進(jìn)行,不能有振動(dòng)。
Test method for static load tester
Fix the test piece to the frame with nails,place it directly on the expanded polystyrene,with the upper surface facing up,press the test piece with the upper frame,place the puncture tool in the middle of the test piece,and test each load interval starting from 5KG With 3 test pieces,the load is increased by 5KG each time until puncturing occurs,or directly to A large load of 20KG,each load interval is 24H,the loading is carried out carefully without vibration.